×
+381 11 404 33 80
office@minselektro.com
Close top bar
Home
Projects
References List
Contact us
English
Deutsch
српски
Toggle navigation
Projects
Home
Projects
All
/
MV Substations
/
Industrial facilities
/
HV Substations
/
HV Cable accesories
Installation of HV cable accessories – Greece
Installation of HV cable accessories – Sri Lanka
Installation of HV cable accessories – Bangladesh
Reconstruction of the granulation plant in the HDPE factory in the “HIP Petrohemija” Pancevo complex
Construction of a silicon metal factory at the Bjelajce, Mrkonjic Grad, Bosnia and Herzegovina
Reconstruction of 110 kV plant and replacement of complete protection in 110 kV and 20 kV plant in SS 110/20 kV “Ada”
Automatization of SS 35/10 kV “Bor 3”
Reconstruction of SS 35/10 kV “Metaljka”
110 kV cable line number 172 SS “Beograd 6” – SS “Beograd 45” – CHP “Novi Beograd”
Automatization of 10 kV facility in SS 110/10 kV and SS 10/0.4 kV Makis
Replacement of relay protection, control and signaling, preparation for SCADA system
Reconstruction of protection & control system in SS 35/10 kV “Zagrađe” with implementation in RCC
Emergency repair of damage to 110 kV HV cable line number 1151, SS “Beograd 15” – SS “Beograd 17”
Construction of 110 kV cable line SS “Beograd 17” – SS “Beograd 23”
Construction of 110 kV cable line SS “Beograd 45” – CHP “Novi Beograd”
Construction of 110 kV cable line SS “Beograd 23” – SS “Beograd 45”
Construction of 110 kV cable line SS “Krusevac 1” – SS “Krusevac 3”
Emergency repair of 110 kV HV cable line number 172 SS “Beograd 6” – CHP “Novi Beograd”
Mozura Wind farm
Converter station “Kotor” – HVDC MON-ITA
Construction of SS 110/35 kV “Kotor” Skaljari
Reconstruction of protection & control system on SS 110 kV “Nikšić 1”
Extension of SS 220/110/35 kV “Mojkovac”
Krnovo Wind farm
Construction of SS 110/10 kV “Klicevo”
Construction of SS 400/110/35 kV “Lastva” and extension of the existing SS 400/220/110 kV “Peljvlja 2”